|
The walkway is supported by 1500 special cantilever brackets fixed to hot rolled 72/48 channels radiussed to suit the tunnel profile. The grid flooring was secured to the brackets by Lindapter Gratefast fasteners. The walkway will be used by maintenance personnel but has been designed to withstand the weight of passengers in the event of an emergency.
The new MetroRail City Tunnel Project (valued at $300 million) has effectively doubled Transperth’s rail network. Undertaken by Leighton Kumagai JV, it commences at Esplanade station under the city from William Street rising at Fitzgerald Street.
Ancon can design and manufacture special corrosion-resistant fabrications ideal for use in heavy industrial environments or locations where maintenance access is impractical or impossible.
|