The Lindapter Hollo-Bolt steel cavity fixing has further demonstrated its capabilities in exacting applications at the prestigious Stadium Australia project, through Australian distributor Binder Engineering (NSW) Pty Ltd. The $0.5bn stadium programme, co-ordinated by main contractor Multiplex Constructions (NSW) Ltd, is transforming a waste site into a sophisticated modern complex with capacity for 110,000 people with 30,000 people at the temporary end stands. The temporary seating is supported on a steel framed structure, which in turn rests on concrete piers. Overlapping steel profiles form the steps and seating areas; they are connected securely to both the structural steelwork and to each other using approximately 80,000 Hollo-Bolts, installed by contractors Transfield.
|